Forget about the time, effort, cost, and headaches of engineering, installing, customizing, and cleaning bulky hard metal ducting with multiple registers.Fabric Ducts are a total game-changer.
LIGHTWEIGHT COMPOSITION
High-quality fiber negates the concern for room load balance and doesn’t require any additional insulation.
FULLY CUSTOMIZABLE
Each and every aspect of configuration, dispersion, mounting, material, and appearance can be customized.
CONDENSA TION-FREE
Airflow permeating around entire surface prevents moisture from forming and dripping into your space.
DIRT-FREE
Constant positive air pressure prevents the build-up of any dust or debris, greatly reducing the frequency of cleaning.
FLAME-RETARDANT
Textile material fiber, optional flame retardant fiber material, can prevent the risk of fire.
MACHINE-WASHABLE
Can be simply taken down, washed, dried, and set back up for thorough sterilization with very minimal down-time.
Application selection -- system selection
Air supply mode and permeability selection
In terms of airflow, the more uniform the better. The fabric duct is pressurized from one end to the other, providing consistent airflow along its entire length. This innovative design allows them to distribute air evenly throughout your room, distributing with the highest precision for consistent drapes. This vital circulation eliminates any possible air pockets, effectively preventing hot and cold spots from occurring.
Shape pipe diameter selection
In view of the different sizes and air output of each site, we work closely with you to select fabric ducts of different diameters according to your actual requirements to ensure that your fabric ducts meet your preferences and implementation requirements.
Selection of functional materials
Parts selection
All accessories provided by JVTIADUCT are specially processed and used for a long time. We will help you match the system accessories according to different fabric distribution duct systems.
cable-gripper
cable
expansion-bolt
ratchet-straps
turnbuckle
U-type-cable-clip
Quick & Easy Installation
Note:Please provide us with the architectural design plan, elevation and section drawing of the project (including the installation position of the air treatment end). We will provide the preliminary project plan within 7 working days according to the drawings and the above parameters.